Construction Unit: Xinzheng Prison, Henan Province Postal address: Intersection of Xinhuang Yanhuang Avenue and Zhengxu Road, Henan (No. 1 Yanhuang Avenue) Design Unit: Zhengzhou Architectural Design Institute Postal address: 8/F, No. 6 Shaoshan North Road, Zhengzhou, Henan Province, 9th Floor, 11th Floor, Zip Code: 450052 Design Unit: Zhengzhou Architectural Design Institute Postal address: 8/F, No. 6 Shaoshan North Road, Zhengzhou, Henan Province, 9th Floor, 11th Floor, Zip Code: 450052 Semi-Automatic L-Bar Sealer Shrink Packing Machine
L bar sealer heat tunnel thermal shrink wrapping machine
Machine characteristics Shrink Sleeve Machine,Semi-Automatic L-Bar Sealer Shrink Packing Machine,Shrink Wrap Machine For Bottle,L Sealer Shrink Packing Machine Hangzhou Xiaoshan Wanfeng Mechanical & Electrical Equipment Factory , https://www.wfengmachinery.com
Project Introduction:
The project is located at No. 1, Yanhuang Road, Zhengzhou, Henan, a comprehensive development with a total construction area of ​​18,442 square meters, including five-storey factory buildings and housing units.
Total project investment: 27 million yuan.
Zip code: 451100
Contact person: Mao Fengchang Telephone, 63205723, 13838346823
Contact: Yan Baoyu (architect)
Phone, 67826680
Contact: Li Hongwei (Structural Engineer)
Phone, 67826680
Stainless steel tube heating shrink tunnel
internal recycle, uniform heating shrink oven
Imported Italy silicon rubber tube material
International advanced technology shrink wrapping machine
Working with semi-automatic L type sealing and cutting machine FQL450F or L type automatic sealing and cutting mahcine,etc
Henan Province Xinzheng Prison Reconstruction and Expansion Phase II Project
Project Name: Phase II Project of Reconstruction and Expansion of Xinzheng Prison, Henan Province Progress: Engineering Design and Construction Period: December 2011-December 2012 Major Equipment: Fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities ,crane.
Related Developments: Tower Crane Infrastructure Project