How to operate salt spray test chamber correctly Salt spray corrosion test chamber is for surface treatment of various materials, including metal plating, hardware, electronic components, chemical paints, paints, automobiles, motorcycles, hardware and sanitary ware, screws, springs, magnetic materials, organic and inorganic coatings, anodes Processing, anti-rust oil and other industries quality testing, testing the corrosion resistance of their products. a Water quality requirements: add filter for industrial water or tap water (filtered pH between 6.5-7.2) or pure water (mineral water containing minerals cannot be practical) b pressure requirements: water pressure in the 1-3 kg, in order to ensure the normal water. c Interface requirements: The equipment outlet should be hosed and sealed with a seal to prevent leakage. aDrilling requirements: The equipment is natural drainage without pressure, the wall opening height is lower than the drainage outlet, to ensure that the drainage is working properly b Interface requirements: The equipment outlet should be connected with a hose or a hard pipe. Use a sealing ring to prevent leakage. a Pressure requirements: air compressor or air supply pipe pressure ≥ 3 kg, and dry and clean b Interface requirements: The device uses a quick connector for easy removal and maintenance c time requirements: the equipment must work for a long time to supply air must not be interrupted halfway aMaterial requirements: must use pvc polyethyl alcohol material (corrosion resistance) b Interface requirements: The device exhaust port should be connected with a hard pipe, sealed with a sealant to prevent air leakage. c. Drilling requirements: The equipment is naturally exhausted. The opening height of the wall needs to be slightly higher than the exhaust hole to ensure that the gas is condensed and flows back to the test chamber. After the end of the salt spray chamber test, carefully remove the test sample from the salt spray chamber, gently rinse with flowing cold water (less than 35°C) or remove the salt deposits from the surface with a cleaning tool such as a seaside, and immediately proceed to 80 ~100 °C, about 30 minutes of drying (if not drying can be clear, except for the tester), and promptly check the test sample for corrosion or other defects. From the routine records of test methods, it is understood that the following aspects need to be considered: 1. The appearance of the test sample after the test 2. Appearance after removal of corrosion products 3. Part, quantity, and condition of corrosion defects (pitting, cracks, bubbles, etc.) 4. The erosion time or the time before the beginning of corrosion Galvanized PPGI Steel Coil,Color Coated Steel Coil,Color Steel Coil,,Cold Rolled Aluzinc Steel Coil Shandong Kuaima Steel Co.,Ltd. , https://www.kuaima-steel.com