February 22, 2025

In August, South Korea's imported car sales hit a record high

South Korea's domestic statistics show that South Korean imports of car sales have hit a record high for three consecutive months.

The Korean Automobile Import Association (KAIDA) stated on the 3rd that in August, Korea's newly registered imported vehicles totaled 8,758 vehicles, an increase of 142.5% compared with the same period last year (3,612 vehicles). This is the third consecutive month that Korea has reached a record high.

From the perspective of car brands, BMW sold the most cars, reaching 2,139 units, followed by Mercedes-Benz (1524 units), Volkswagen (784 units), Audi (758 units), Toyota (606 units), and Honda (479 units). ), Mini (406 cars) and so on. The best-selling model was the BMW 528 (833), and the Mercedes-Benz E300 (578) and the Toyota Camry (394) ranked second and third respectively.

From January to August of this year, the cumulative sales volume of the World Bank's imported cars in South Korea reached 58.371 million units, an increase of 59.2% compared with the same period of last year (36.674 million vehicles).

Pre-insulated Pipe Fabrication

Pre-insulated, pre-fabricated jacketed piping system is used for industrial and commercial applications. Pre-Insulated, pre-jacketed thermal pipe has a definite advantage over field installed insulation and jacketing. All straight sections of the factory preinsulated piping system shall be jacketed with a High Density Polyethylene (HDPE) jacket conforming to ASTM D1248,PVC jackets shall not be allowed.

All field butt joints shall be made in straight sections of pipe.here for welding polyethylene, it can use field hdpe pipe Butt Fusion Machines according to pipe range. For PE Pre-insulated pipe fabrication, It will use workshop fitting machines for bend fabrication of plastics. How it works? Firstly you need to prepare pe pipe Angle Cutting Saw and fix thin pipe on sepcial clamp, and then cut hdpe pre-insulated pipe in required angle. Then move this pipe and fix them on elbow clamps of pre-insulated fitting welding equipment. Special half heating plates positioned on top of the welding zone are used to ensure the required welding temperature, The appication of uniform welding pressure which is controlled hydraulically, ensures the quality of the weld between the sleeve and the pipe casing. The welding phases of pipe fabrication are below: 1. Approaching and preheating 2: Heating 3.Removing the heating element 4. Reaching the welding pressure 5.Welding 6. Cooling


Pre-Insulated Pipe Fabrication,Custom Pipe Fabrication,Pipeline Fabrication,Butt Fusion Welding Machine

WUXI MEIERTE MACHINERY TECHNOLOGY CO.,LTD , https://www.wxpipefusionweldings.com