On July 16, Jilin Petrochemical's 159,000 tons/year ethylene glycol unit with 50,000 tons/year ethylene oxide unit was delivered and overhauled. There are a total of 80 overhaul tasks, including the T-530 tower and R-520 reactor technical renovation work. It will continue until the 26th of this month. It will further enhance the stable operation and profitability of the equipment, to meet the arrival of the production and sales season. Solid foundation. Forged Ring,Stainless Steel Ring,Rolled Aluminum Rings,Aluminum Forged Rings Suzhou SNK Machinery Equipment Co.,LTD , https://www.snkforgedroll.com