Mount Isa Lead-Zinc Mine Concentrator

(1) Mount Isa (Mount Isa) lead-zinc ore processing plant located in northwest Queensland, Australia, from Townsville 600km. It is called No. 2 Concentrator in the joint company of Mount Isa. It was completed and put into production in 1965. After the expansion in August 1981 reached the amount of ore daily processing 7750t, lead metal annual production to 18 million tons.

(2) The deposit and ore mining area was discovered in 1923, and the ore body was 1.067m thick and 2000m wide. Dolomite deposits of volcanic belt in a thin layer and having a fine-grained pyrite seam rich composition. In the tuff and carbonate, shale galena, and sphalerite are rich in slender ore bodies. The main minerals are galena, sphalerite, pyrite, etc. The ore grade: lead 7.O%, zinc 6.7%, silver 173g per ton.

(3) Crushed ore and heavy medium ore dressing ore is set in the pit. After being broken to 100mm, it is lifted to the ground. Then use a two-stage, one-closed process, from 100mm to 11mm. There are two series of ground breaking systems, one of which is spare. The crushing workshop has a control room that can control the opening and closing of major equipment and has TV monitoring. The throughput of the crushing operation is controlled by the concentrator computer.

In 1981, a heavy medium sorting workshop was built to treat the crushed ore and produce pre-enriched concentrates with a yield less than 70% of the original ore and a metal recovery rate of over 90%. The plant has increased the ore processing capacity to 3.2 million tons per year to meet the goal of producing 180,000 tons of metal per year.

Heavy medium beneficiation process at Mount Isa lead-zinc ore dressing plant

Mount Isa Lead-Zinc Mine Concentrator