Quartz sub-boiler distilled water maintenance method

After the quartz sub-boiler has been used for a period of time, the scale is collected in the horizontal flask and on the surface of the heating tube. At this time, cleaning must be performed. The number of cleanings depends on the hardness of the tap water and the time of use, such as the instrument for a long time. Without cleaning, the distillation effect must be influenced, and the heating tube must be severely damaged and the cleaning time must be extended.

The installation method of quartz sub-distillers is as follows:

1. Place the quartz sub-boiler on the workbench (near the water source and power supply), and insert one end of the frosted port of the condenser into the frosted mouth of the horizontal flask.

2. The overflow outlet hose and the condensate outlet hose can be introduced into the waste water pool; the condensate inlet hose is connected with the commercial tap water pipe; then the water inlet hose is connected with the steamed raw water, and the original water inlet hose is installed with a water stop clamp. Finally, connect the condenser connector hose to the receiving bottle.

Quartz sub-boiler distilled water cleaning steps are as follows: 1. Cut off the power and turn off the tap water.

2. Add concentrated hydrochloric acid 100ml to the horizontal flask to release hydrochloric acid with the water in the bottle. If there is more hydrochloric acid in the scale, add more, release it several minutes later by the water leveler, and finally rinse with tap water several times to remove trace hydrochloric acid. The flask can be shaken back and forth, making it difficult to clean the corner flush.

3. When distilling again, begin to distill the distilled water within 10 minutes.