February 22, 2025

Special clean-up of toll roads: 9 provinces and cities to reduce the charging standards withdrawal and charging stations

Special clean-up of toll roads: 9 provinces and cities to reduce the charging standards withdrawal and charging stations According to Voice of China’s “National News Network” report, the highly-recognized “Special Clearance of National Toll Roads” has entered the stage of self-checking and self-correction since September. So far, 9 provinces and autonomous regions have adopted lowering of charges and repurchase some of them. Toll stations and other measures to rectify some of the road sections.

Ministry of Transport spokesman He Jianzhong revealed at today’s press conference that at present, the provincial-level special clean-up work leading groups are sorting out, reviewing, summarizing, and analyzing the first-stage investigations and investigations. The provincial people’s government will After the audit, it is announced to the public and accepted by the society.

He Jianzhong: In recent days, the five ministries and commissions set up a coordination mechanism for the special clean-up work of toll collection work, held the first inter-ministerial joint meeting, and will further supervise and guide the special clean-up work around the country. In the near future, it will further urge all localities to speed up the investigation of the first-phase investigation. Review the work and publish the first phase of the investigation as soon as possible.

He Jianzhong disclosed that there have been nine provinces that have taken the lead in implementing the rectification measures, adopting measures such as lowering the charging standards for individual road sections and revoking some toll booths, resulting in preliminary results:

He Jianzhong: For example, in Beijing, Shandong, Henan, Jiangxi, and Jiangsu, there are Shanxi, Heilongjiang, and Hebei, Shaanxi, and so on. These provinces have already taken some road sections during the first phase of clean-up work. Measures.

According to the implementation plan issued by the five ministries and commissions, until the end of this year's self-examination and self-correction on December 31 this year, various localities must propose specific rectification measures for various types of non-compliance and irrational charges, and the five ministries and commissions also organize inspection teams to inspect key areas. guide.

Round Open Water Cooling Tower

The whole structure is solid and light;the body and water pond is manufactured with reinforced glass fibre (FRP glass fiber reinforced plastics),never being corrosive. The surface finish is added with ultraviolet inhibitor,which can resist sunshine attack and damage.

All steel and iron material is processed through galvanizing by dipping,Ocorrosion resisting and durable.

Special designed axial-flow type air blower applies belt reduction gear,reducing low noise and sufficient wind; tailor-made water-drop noise
reduction carpet to eliminate water sound.

Apply special design PVC water block curtain (water-stop) to prevents plashing) remarkably; pressure drop loss is slight and splashing loss i under 0.001%.

Special designed water sprinkler with big bore diameter,which won' t cause blocking but the sprinkling effect is very good. It is installed in the tower,so it won' t bee polluted by outside dust and foreign matters.


Apply cellular vacuum molding heat dissipation material, stagger arrangement surface has grooves and the heat exchange effect is especially good.


Water pond applies slant design, easy to wash, containing less water; the operating weight is lower, but the water tank is very big, so it won't absorb air.

The cooling tower support is light and solid, convenient to assembly no matter there is suspension iron rack or not.


Round Open Water Cooling Tower,Water Cooling Tower,Round Cooling Tower,Cool Water Towers

Wuxi Ark Fluid Science Technology Co., Ltd. , https://www.fangzhouarkfluid.com