Plastic print box
Acetate gift print boxes with tuck in tops and bottoms .Tuck top boxes have a tuck top plus two small side flaps on the top opening of the acetate gift box along the top edges.Suitable for packaging small gifts & crafts,jewwlry,chocolate,speciality candy which can make a memorable surprise for your guests.Acetate gift box can be decorated with colored ribbon ,flowers or afix to personalized labels ,stickers or charms to match your weddin theme.
Advantages of custom plastic print box:
Take cosmetic product as an example ,one of the biggest advantages of using this kind of Plastic Box for cosmetic packaging is they are highly cost effectively.When compared to other packaging alternatives like matals,plastic packaging is much cheaper and effective.Plastic box also reduce the cost of transportation of products.
Cosmetic products packaged in clear plastic box take less space and this ensures that more volum of products can be transported using the same amount of fuel.
This cuts dowm transportation costs and adds to the profitability of business.
Plastic Print Box,Clear Plastic Folding Packaging,Acetate Gift Print Boxes,Printed Clear Boxes Shenzhen Stardeal Industrial Co.,Ltd , https://www.plasticblisterpacks.com
PRODUCT DESCRIPTION
This machine is specially used for producing longitudinal welded pipe in metallurgical, construction, transportation, machinery and vehicle engineering industries. With strip steel as the raw material, through cold roll forming and high frequency welding techniques, it produces round pipes and square pipes with required sizes. By making the best of the similar products home and abroad and integrating with our company's years'Â practical experiences, we improved and upgraded the machine and came up with its latest generation. In particular, the advanced technologies namely roll pass design, computer saw PLC automatic control tracking system, UK European continent full digital servo system enable the machine to realize high efficiency, low fault rate, convenience of operation and maintenance, thereby saving investment, both economical and practical, and is equivalent of advanced pipe making machine abroad.
SPECIFICATIONS
GENERAL PROCESS
Double head uncoiler → Shear & butt welder → Accumulator → Forming section(flattening unit+mani driving unit+forming unit+guide unit) → High frequency welding unit+ squeeze roller → De-burr frame → Cooling unit → Sizing unit and straightener → Flying saw under computer control → Run out table
MAIN COMPONENTS:
1 Uncoiler
2 Accumulator
3 Shearing and butt welding machine
4 Forming machine
5 Roller System of Forming
6 Seam Guide
7 High Frequency Induction Welding Machine
8 Roller System for Moving
9 Burr Removing Frame(Inside and outside)
10 Water cooling system
11 Sizing machine
12 Roller System of Leveling
13 Speed Testing Wheel
14 Turkish Frame
15 Auto flying saw controlled by Computer
16 Run-out table
17 Electric control Equipment
18 High frequency welding machine
PACKAGE AND SHIPPING
1 Container:1*40GP
2.Port:Tianjin Port
3.Package:According to the inter national martime standards
Large machine:
1).Use steel wire ang wood to fix the large machines.
2).Use shockproof film to protect the external motor.
Middle machine:
Use wooden box,waterproof and shockproof film to pack the machines.
SERVICES
Pre-sale service
1). Offer honest and objective investment consultancy suggestion based on our many years engineering experience in the steel pipe industry.Â
2). Provide planning and implementation suggestion of plants for factory long-term and consistent development.Â
3). Share our analysis and forecast with clients the global trends of steel industry, especially the market in China.Â
4). Clients are welcome to visit the production line of steel pipe at our factory and our cooperated domestic customer factories.Â
After-sale service
Â
Â
Straight Seam High Frequency Welded Pipe Mill/Welded Tube Mill
1).After the equipment arrives at the assembly field, the technicians from supplier will help direct the construction and debugging.
2).Guarantee period is one year after installation and final acceptance or 15 months after delivery date, whatever occurs first.
3).Within guarantee period, supplier is responsible for solving anomalies of the equipment,which is in the conditions of correct operation and response time shall be less than 48hours (irresistible factors are excluded). Human damaged and vulnerable parts are excluded from guarantee.
4).If the equipment are out of work one year after acceptance within the operating time, the supplier will only charge maintenance cost which include travel expenses of our repairman, cost of changing spare parts, etc.