February 22, 2025

Zhongchuan Chengxi won 300 sets of GE wind towers

Recently, GE Company has placed a batch of 300 sets of 1.6MW 80M cold-temperature type wind towers to Zhongchuan Chengxi.
On this basis, GE has added 34 sets of 1.6MW 100M wind tower orders, which has increased the total order for CSSC Chengxi to hold the model wind tower to 80 sets.

Water Filling Machine

Water Filling Machine one of the most important part in Water production line. The whole line consist of 5 parts:

1.Bottle Blowing Machine

2.Water treatment system

3.Water filling machine

4.Labeling machine

5.Shrink Packing machine

If you want to start from raw material, need add the equipment of PET injection molding machine and PET Preform Mould.

We offer the completely water production line!

Water Filling Machine,Water Bottled Machine,Water Production Line,Water Bottling Machine

WENZHOU WINIBER MACHINERY EQUIPMENT CO., LTD. , https://www.winibermachine.com